189 Queen Street, Adina Hotel – Toga Construction
189 Queen Street, Adina Hotel - Toga Construction
Express Tiling was awarded this project from Toga Constructions which consisted of 156 Apartments and over 200 bathrooms, Ground Floor Lobby and Level 5 Swimming Pool/Balcony/Gym Area Refurbishment. This project involved Screeding, Waterproofing, Shower hob/floor and wall prep (Grinding/Priming). Tiling consisted of 300 x 600mm Porcelain Tiles full bathroom wall tiling for all bathrooms and 300 x 600mm Porcelain Tiles for the floors of the bathrooms. Our team managed to complete 1 floor per week which consisted of 14 bathrooms per level, complete floor and wall tiling. The level 5 Swimming Pool / Balcony area covered an area of over 300m2 of Floor Screeding, Waterproofing, Caulking and Tiling consisted of 300 x 600mm Porcelain Tiles. Express Tiling managed to exclusively include a special custom made pool capping of the Porcelain Tiles. The Ground floor lobby consisted of Polishing and Sealing the existing floor marble and replacing the Expansion joint with Polyurethane.
July 2016 - July 2017